Hotlines:


Call us! Request call back Working hours

Turn Key Plumbing for New Build Apartments - Kyiv

We design and install a complete plumbing system in your brand‑new flat—pipe routing, fixture mounting and pressure testing. Our technician arrives within a precise ±30‑minute slot and backs every job with a 24‑month warranty • Prices from ₴4 000.

From 4 000 грн.
Order service
Free consultation — we’ll suggest the right service & price

Leave your number and specialist will answer all questions

(6 comment)

Why you need this service

Developers hand over shells with exposed risers only. A professional “first‑time‑right” installation prevents leaks, protects décor and adds long‑term value to your property.

Problems we solve

  • Waiting all day. Typical Kyiv services book 3‑ to 4‑hour windows; Mastergaz commits to ±30 minutes.
  • Short warranties. Market coverage is 6–12 months; we double that to 24 months for total peace of mind.
  • Project drift. Your design layout is followed precisely—no costly rework or misplaced outlets.

Step‑by‑step workflow

  • Free video or on‑site consult (15 min) and budget outline.
  • Engineer visit in the agreed slot (±30 min) with digital checklist.
  • Material sourcing—we can supply or use items you already bought.
  • Pipe routing for water and waste lines (typical labour 100–170 UAH / m).
  • Fixture installation (e.g., toilet from ₴650; sink from ₴700).
  • Hydro‑test & photo report; workplace cleaning.
  • Handover & 24‑month certificate signed with you on site.
  • Pricing logic

    Item

    From (UAH)

    Notes

    Base package ≤ 50 m²

    4 000

    includes design review and full install

    Extra outlet (water / waste)

    600

    fixed rate per point

    PPR pipe

    45–100 / m

    durable budget option

    REHAU PE‑Xa pipe

    100–200 / m

    premium flexible pipe

    Every quotation is itemised, approved in writing and frozen for the project duration.

    Guarantees, terms, timing

    • 24‑month workmanship warranty—twice the city norm.
    • Standard completion: 2–5 business days for a two‑room flat.
    • Status alerts: SMS 24 h and 30 min before arrival keep you informed.

    Request your free estimate today—enjoy flawless plumbing and zero stress within a week!


    ORDER CALCULATION
    We will call you back in 10 minutes!
    Go to the full version of the page