Hotlines:


Call us! Request call back Working hours

Professional Sewer Installation in Kyiv — the technician arrives on time (±30 min)

Reliable PP-R plastic piping, noise-free operation and a fixed 24-month warranty from the market leader. Starting at ₴1 300 per linear metre, with an instant photo-based quote and no hidden charges.

From 1 300 грн.
Order service
Do you want to get advice on the installation, verification of water and heat meters, the features of their registration, and our other services?

Leave your number and specialist will answer all questions

(6 comment)

Why You Need This Service

A correctly installed sewer system keeps your home safe from leaks, clogs and expensive repairs. Modern PP-R pipes deliver up to 50 years of service without rust or deposits, ensuring decades of comfort.

Problems We Solve

  • Frequent blockages — we set the recommended 2–3 % slope so wastewater flows freely.
  • Corrosion and noise of metal stacks — PP-R is silent (≈17 dB) and corrosion-proof.
  • Unexpected leaks — heat-fusion joints create a single, leak-tight pipeline.
  • Short warranties in the market — we give an official 24-month guarantee, twice the usual term.

Step-by-Step Process

  • Photo quote — send pictures, get a preliminary cost in 15 minutes.
  • Punctual arrival — technician appears within the agreed 30-minute slot, saving your day.
  • Clean demolition — removal of old pipes if required, with dust control.
  • Installation — PP-R pipes laid with precise slope; professional metal-to-PP-R transitions where needed.
  • Pressure & visual tests — system checked under load, then the workspace is cleaned.
  • Handover — you receive an acceptance certificate and the warranty card.
  • Pricing & Cost Factors

    Item

    From, ₴

    PP-R sewer pipe Ø 50 mm

    1 300 / m

    Transition metal → PP-R

    300 / m

    Wall chasing (brick / concrete)

    250 / m

    Removal of old cast-iron pipe

    200 / m

    Sewer connection point (appliance)

    350 / pcs

    Final price is fixed in the contract after the on-site survey — no surprises.

    Guarantees, Conditions, Lead Times

    • 24-month warranty on labour and materials.
    • Standard apartment: 4–8 hours; large properties: up to two days.
    • Work seven days a week, 08:00–20:00.
    • You pay only after approved completion.

    Send us photos of your current system and receive a detailed quote within 15 minutes. Book an exact arrival window and forget about sewer problems for decades.


    ORDER CALCULATION
    We will call you back in 10 minutes!
    Go to the full version of the page